honors

News
Your current location:Home - > News

Design and construction of storage tanks Points


1, the volume of general storage tanks have 5m3,8 m3,10 m3,15m3 generally not more than the maximum volume of 15m3. Storage tanks should be set to the filler pipe, the pipe, the return pipe, snorkel, metering orifice.

2, buried tank for corrosion protection, and installation breathing tube with a flame arrester. Tank must be based firmly fixed. After the buried oil tank should cover the fine sand, and then casing. Soil thickness greater than 0.5 m.

3, daily hot water tank provided in the vicinity of the unit. As provided in the room, separated from the application fire wall. Daily fuel tank should be above the burner from 0.5 to 6 meters, but the maximum oil burner can not be higher than 10 meters.

4. Daily fuel tank fuel tank should be closed, and the total volume of not more than 1m3.

5, should be set straight outdoor breathing tube and tank overflow pipe to the tank daily. Flame arrester breathing valve and install on a breathing tube. Tank oil level control device shall be provided with oil supply chain, it is recommended to use magnetic sub-level gauge displays the oil level.

6, the hydraulic system should be installed oil filter, for general pump (gear pump or screw pump) pre-filter requires 20 to 30 mesh / inch, the flow area of the filter should import its cross-sectional area of 8 to 10 times; combustion unit machine requires pre-filter 80 mesh / inch, the flow area of the filter should import its cross-sectional area of 2 times.

7, should be seamless tubing welded connections, the device should be used flange connection and 0.2mpa pressure leak test to ensure no leakage. TIG welded tubing should be primed, and then cover up the AC welding.